LG Water Solutions,LG Chem
Technical Documents

Technical Bulletins

Technical Service Bulletin – All in one (101 ~ 115)

Download
  • 101. Receipt of Elements, Short-Term Storage, and Disposal of Used Elements

    Download
  • 102. Element Loading Guidelines

    Download
  • 103. Vessel Shimming Procedures

    Download
  • 104. Membrane Element Start-up Shutdown Procedures

    Download
  • 105. Membrane Storage Inside Pressure Vessel

    Download
  • 106. Membrane Element Operating Precautions

    Download
  • 107. Silt Density Index (SDI15) Procedure

    Download
  • 108. Vessel Probing

    Download
  • 109. Membrane Element Flushing

    Download
  • 110. Return Merchandise Authorization Procedure

    Download
  • 111. Data Logging and Performance Normalization

    Download
  • 112. Biocides for Disinfection and Storage

    Download
  • 113. Membrane Cleaning

    Download
  • 114. Brine Seal Replacement

    Download
  • 115. RO Element Start-Up Considerations and Checklist

    Download
Rejection of unauthorized e-mail collection

We reject any automatic collection of e-mail addresses on this website. Please note that anyone violating this can be punished in accordance with the information and communication network laws.

Korea Internet Security Agency (KISA) http://www.spamcop.or.kr